MIL-DTL-18045G
Construction of type II preserver - Continued.
TABLE III.
Seam
Operation
Stch
stch
Stch
No.
type
type
inch
B. Stitch end of one webbing to
301
Box-
8/10
jacket at edge of tunnel open-
stitch
ing with a diamond shape box-x,
X
1 inch X 1 inch to inner side
of outer jacket.
C. Repeat above with 2nd webbing
301
Box-
8/10
box-x, 1 inch X 1 inch on
stitch
opposite end of tunnel to be
X
formed.
18
Close tunnel:
A. Close tunnel at bottom of
301
BSa
8/10
entire jacket using 3/4 inch
width binding tape with both
inner and outer jacket sections
together, S/N 1/8 inch from
edges of webbing.
B. Fold ends of binding tape and
Bartack
insert in opening at both ends
of vest and bartack.
19
Bartack upper section of shoulders
Bartack
near slide fastener on back sec-
tion (2 places).
20
Chest strap (1 each):
A. Cut webbing 1 inch X 63 inches
long.
B. Turn under 2 inches forming
301
Box-X
loop for D-ring and box-x 3/4
inch X 1-1/4 inches on left
end of webbing.
C. On opposite end (right side)
301
Box-X
8/10
weave webbing with 1 inch
slide and snaphook, turn or
fold end to form loop 2-1/2
inches and boxstitch X, 3/4
inch X 3/4 inch.
21
Front leg straps (2 each):
A. Cut webbing 1 inch X 7 inches
(2 each).
B. Fold under one end of webbing
7/8 inch then form a loop with
2 each D-rings inserted inside
allowing both ends webbing to
meet.
15
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business