MIL-DTL-18045G
Construction of type I preserver - Continued.
TABLE II.
Seam
Stch
stch
Stch
No.
Operation
type
type
inch
21
S/N stitch starting under armhole
301
SSa
8/10
along premarked locations curving
toward front, following marks at
approximately 3 inches from bottom
across left front, the back and
front along curved marking, ending
under eight armhole barlock stitch
both ends.
22
Tunnel tapes (2 each):
A. Cut tunnel tapes, webbing 1-1/8
inches wide X 66 inches long -
2 each.
B. Stitch end of one webbing to
301
Box
8/10
jacket at edge of tunnel open-
stitch
ing with a diamond shape box-X
-X
1 inch X 1 inch to inner side
of outer jacket.
C. Repeat above with 2nd webbing
301
Box
8/10
Box-X, 1 inch X 1 inch on
stitch
opposite end of tunnel to be
-X
formed.
23
Close tunnel:
A. Close tunnel at bottom of
301
BSa
8/10
entire jacket using 3/4 inch
wide binding tape with both
inner and outer jacket sections
together, S/N 1/8 inch from
edges of webbing.
B. Fold ends of binding tape and
301
Bartack
insert in opening at both ends
of vest and bartack.
24
Bartack upper section of shoulders
Bartack
near slide fastener on back
section (2 places).
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business