MIL-L-24778(sH)
TABLE II.
Construction (cent'd) .
Operation
No.
Stch
Seam/
stch/
Thread
type
stch
in
ndl
type
bob/lpr
(t) Attach a 66 inch long piece of 1
301
LSbj -1
8-12
inch webbing to the inside of the left
front pocket flap per webbing attach-
ment mark noted on PKT FLAP-LFT.
Enclose the raw edge of webbing and
secure with a 3/4 inch cross-boxstitch.
(u) At remaining end of strap, form a
Bar-
BFb-1
5 inch loop, with raw edge turned under
tack
1 inch.
Bartack with a 3/4 inch long
bartack through all plies.
(v) Attach a 22 inch cord to whistle,
and knot at one end.
Take the remain-
ing end and knot the whistle assembly
to the grommet on right pocket (near
indentation) .
5.
Make hood.
(a) Join hood panels together at
301
LSq-
8-12
center seam.
2(a)
(b) Bind center seam.
301
BSC-1
8-12
8.12
(c) Turn seam allowance to the right,
301
LSq-
and topstitch 1/8 inch from folded
2(b)
edge .
(d)- Bind face opening.
301
BSC-1
8-12
(e)
Position face shield to inside of
301
LSbj -1
8-12
hood and stitch, placing the stitching
on the binding stitching of operation
5(d).
(f) Bind ear openings.
301
BSC-1
8-12
301
BSC-1
8-12
(g) Bind outer raw edge of hood.
(h) Stitch hook portion of fastener
301
LSbj -1
8-12
tape to inside of the hood in two loca-
tions according to marks on hood casing
marker pattern.
(i) Stitch loop portion of fastener
301
LSbj -1
8-12
tape to inside of the hood in two
locations according to marks on hood
casing marker patterns.
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business