MIL-L-850E
Acquisition Documents should
6.2 Acqu isition re quirements.
specify the following:
Title, number, and date of this specification.
(a)
(b). .
Issue of DoDISS to be cited in the solicitation,
and if required, the specific issue of the individual
document referenced (see 2.1).
When first article is required (see 3.1)
(c)
Selection of applicable levels of packaging and
(d)
packing required (see 5.1).
When first article inspection is required, the
6.3 First article
contracting office should provide specific guidance to offerors
whether the item(s) should be a preproduction sample, a first article
sample, a first production item, a sample selected from the first 7
production items, a standard production item from the contractor's
current inventory (see 3.1) , and the number of items to be tested as
specified in 4.3. The contracting officer should also include
specific instructions in acquisition documents regarding arrangements
for examinations, approval of first article test results, and
Invitations for bids should provide
disposition of first articles.
that the Government reserves the right to waive the requirement for
samples for first article inspection to those bidders offering a
product which has een previously acquired or tested by the
Government, and that bidders offering such products, who wish to rely
on such production or test, must furnish evidence with the bid that
prior Government approval is presently appropriate for the pending
Bidders should not submit alternate bids unless
contract.
specifically requested to do so in the solicitation.
6.4 Subiect term (key word) listing) .
Buoyant
Collar
Outer Jacket
Slide Fastener
Vest
14
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business