MIL-PRF-81542C
TABLE II. Qualification examinations and tests.
Inspection
Requirement
Test Method
Weight
3.16
4.7
Stowage
3.17
4.8
Actuation pull force test
3.18
4.9
Jump test
3.18
4.10
Pressure
3.19.1
4.11.1
Leakage
3.19.2
4.11.2
Operational test
3.14, 3.15, 3.20
4.12
Visual examination
3.4-3.13, 3.22
4.6
Temperature extremes test
3.21.1
4.13.1
Low pressure (altitude ) test
3.21.2
4.13.2
Vibration
3.21.3
4.13.3
Accelerated aging/life cycle
3.21.4
4.13.4
4.3 First article inspection. First article inspection, when required, shall be accomplished as
specified herein. The first article inspection shall consist of the tests and examinations specified in
table III (see 6.2).
TABLE III. First article examinations and tests.
Inspection
Requirement
Test Method
Weight
3.16
4.7
Stowage
3.17
4.8
Actuation pull force test
3.18
4.9
Pressure
3.19.1
4.11.1
Leakage
3.19.2
4.11.2
Visual examination
3.4-3.13, 3.22
4.6
4.4 Conformance inspection. The conformance inspection shall consist of the tests and
examinations specified in Table IV (see 6.2). Unless otherwise specified, the sampling plan shall
be in accordance with ANSI/ASQ-Z1.4, Table I - Sample Size Code Letters, Special Inspection
Level S-3. Each lot shall be inspected for conformance.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business